Project 08 / Equipment cooling · Thermal management
Bedford Substation Room Ventilation Assessment CFD Study
A constrained relief-air arrangement verified at peak transformer heat load.
- Location
- 16–30 Prospect Street, Kangaroo Point, QLD
- Project context
- Mixed-use tower · Energex interface · Engineering consultant: Confidential
The Bedford tower exterior
Headline result+1.5 °C relief-air rise
Verified30.9 kW heat load
Verified2.66 m³/s airflow
Verified≈ 623k cells
The study
Thermal performance proven despite a non-preferred air path.
Challenge
Spatial constraints prevented the Energex-preferred opposed inlet and relief arrangement, raising concerns around transformer cooling, stratification and recirculation.
Method
A multi-zone k–ω SST model connected the substation, fan room, ductwork, basement driveway and louver interfaces under a 30 °C ambient condition.
Outcome
Heat removal remained effective, velocities stayed below the 1.5 m/s limit and only minor, non-critical high-level warm pockets were observed.