Project 01 / Car park ventilation · CO dispersion
The Switch Car Park Ventilation CFD Study
Two basement levels verified against short- and long-term carbon monoxide exposure criteria.
- Location
- 23/25 Lachlan Avenue, Macquarie Park, NSW
- Project context
- Student accommodation serving the Macquarie University precinct · Engineering consultant: Confidential
Macquarie Park building render
The study
Safe dilution, demonstrated under realistic traffic loading.
Challenge
The proposed mechanical ventilation system required independent verification across two basement levels, with particular attention to breathing-zone exposure, local accumulation and extended operation.
Method
A full three-dimensional transient model represented supply and exhaust systems, vehicle emission profiles and monitored breathing-zone planes. Performance was assessed against AS 1668.2:2012, AS 1668.2:2024 and NCC requirements.
Outcome
The design maintained compliant concentrations, achieved uniform distribution and showed no persistent stagnation or high-risk CO regions.